UH Library concrete sidewalk repairs

This notice is from the archives of The Notice Board. Information contained in this notice was accurate at the time of publication but may no longer be so.

Please be advised that between August 20-22 there will be contractors doing minor repairs in two locations to the concrete sidewalks at the Library bus loop entrance.

During this time, barricades will be set up around construction areas and signage will be posted. Library entrance access will not be affected. Please follow all signage.


Contact:

Greg Lacey | greg.lacey@uleth.ca | 403-380-1891