Sorry, we weren't able to find the requested page

We'd love to help you find what you are looking for:

  • Try retyping the URL of the page you want to visit in the event that there was a misspelling.
  • Navigate the site using the menu above or visit the uLethbridge home page.
  • Use the search feature at the top of any page to find what you were looking for.

Perhaps this search might help...
  1. Comprehensive Institutional Plan 2012-2013 to 2014- 2015

    https://www.ulethbridge.ca/vp-admin/comprehensive-institutional-plan-2012-2013-2014-2015

    184 198 163 164 162 Fine Arts- 1- 4 10 14 13 13 13 Health Sciences 31 28 27 31 34 35 37 39 41 ... is student and 11 University of Lethbridge, CIP 2012/13 – 2014/15 employer demand. This must be ... 2010/11 2011/12 2012/13 2013/14 2014/15 Undergraduate 6,520 6,503 6,296 6,361 6,448 6,393 6,430 6,455 ...

  2. Comprehensive Institutional Plan 2011-2012 to 2013- 2014

    https://www.ulethbridge.ca/vp-admin/comprehensive-institutional-plan-2011-2012-2013-2014

    existing space. The average age of the 41 buildings on campus is 20 years, and there are about $110 million ... The number of graduates has risen by almost 50% since 2000-01 but retention rates from the first to ... University of Lethbridge offers masters and doctoral programming, and we integrate graduate studies with ...

  3. School of Graduate Studies

    https://www.ulethbridge.ca/graduate-studies

    Welcome to the School of Graduate Studies Our office is currently open by appointment only Send ... appointment  requests to sgs@uleth.ca Monday to Friday, 8:30 a.m. to 4:30 p.m. School of Graduate Studies ... School of Graduate Studies, Mission Statement Our Stories Research symposium provides University of ...

  4. 2010-11 Fees and Rates

    https://www.ulethbridge.ca/vp-admin/2010-11-fees-and-rates

    1.5% (2009-10 4.1%, 2008-09 4.6%). Recommendation 1: That the fees for instruction, for 2010-11 be ... Operator 27.46 6% 29.11 6% 30.85 6% 32.71 6% 34.67 Maintenance Worker 16.41 6% 17.39 6% 18.44 6% 19.54 6% ... 39 APPENDIX E- Parking Permit Areas ……………………………………………… 41 APPENDIX F- Student Fee Review Committee ...

  5. June 2012

    https://www.ulethbridge.ca/governance/june-2012-0

    approved with the addition of 4.1 Appointment of Student Members. Motion: Carried 2. APPROVAL OF MINUTES ... one priority of the University is still the academic building.     4. ITEMS FOR ACTION 4.1 ... quality review conducted of our own process came forth with 41 recommendations, and twenty seven ...

  6. 2014-15 Fees and Rates

    https://www.ulethbridge.ca/vp-admin/2014-15-fees-and-rates

    2011-12:.35%, 2010-11: 1.5%, 2009-10: 4.1%). Recommendation 4: That the fees for instruction for 2014-15 be ... FEES 4.1 TUITION FEES Actual % Proposed % Proposed % Proposed 2013-14 Inc 2014-15 Inc 2015-16 Inc ... FEES______________________________________________________ 5 4.1 Tuition Fees________________________________________________________________ 5 4.2 Faculty ...

  7. 2012-13 Fees and Rates

    https://www.ulethbridge.ca/vp-admin/2012-13-fees-and-rates

    calculating the maximum fee increase in 2012-13 is 1.45% (2011-12:.35%, 2010-11: 1.5%, 2009-10: 4.1 ... / Hour * 58 5.2% 61 4.9% 64 4.7% 67 Senior Student Rate / Hour* 35 5.7% 37 5.4% 39 5.1% 41 Musical ... 4% 25.00 4% 26.00 4% 27.00 Half-size, 2 semester 41.25 4% 42.75 4% 44.25 4% 46.00 Half-size, year ...

  8. 2013-2014 Budget

    https://www.ulethbridge.ca/vp-admin/2013-2014-budget

    4.1% 802,249$ Student Admin Fee Increase 11.5% 1,365,495$ 6.8% 1,048,734$ 2.8% 553,603$ 1,632,911$ ... & Services 1,841 832 738 Travel 41 16- Capital & Equipment 65-- Parking to Ancillary Operation ... 141,820$ 142,275$ General Grant Change (41)-- Grant Increase (7,225)-- General Fee Increase 862 631 614 ...

  9. Institute for Child and Youth Studies

    https://www.ulethbridge.ca/research/centres-institutes/institute-child-and-youth-studies

    the Board of Governors on October 11, 2012, and our first Annual General Meeting was held on April 19, ... Institute for Child and Youth Studies Who are We? Goals of I-CYS The University of Lethbridge’s ... Institute for Child & Youth Studies (I-CYS) is a multidisciplinary research institute committed to ...

  10. 2012-2013 Budget

    https://www.ulethbridge.ca/vp-admin/2012-2013-budget

    by AET, used for the 2012-13 increases is 1.45% (.35 % in 2011-12, 1.5% in 2010-11, 4.1% in 2009-10). ... indicates the base operating grant on a per student basis. 39,769,061 41,292,825 45,284,900 50,599,000 ... REDUCTION 953,511 Reductions from Non-Salary Expense Lines 182,282 Reductions from Sessional Budget 41 ...