Sorry, we weren't able to find the requested page

We'd love to help you find what you are looking for:

  • Try retyping the URL of the page you want to visit in the event that there was a misspelling.
  • Navigate the site using the menu above or visit the uLethbridge home page.
  • Use the search feature at the top of any page to find what you were looking for.

Perhaps this search might help...
  1. Comprehensive Institutional Plan 2012-2013 to 2014- 2015

    https://www.ulethbridge.ca/vp-admin/comprehensive-institutional-plan-2012-2013-2014-2015

    is student and 11 University of Lethbridge, CIP 2012/13 – 2014/15 employer demand. This must be ... 2010/11 than in 2001/02. While the number of graduates has increased overall, the program completion rate ... 2010/11 2011/12 2012/13 2013/14 2014/15 Undergraduate 6,520 6,503 6,296 6,361 6,448 6,393 6,430 6,455 ...

  2. Comprehensive Institutional Plan 2011-2012 to 2013- 2014

    https://www.ulethbridge.ca/vp-admin/comprehensive-institutional-plan-2011-2012-2013-2014

    30,162 19.6% Lethbridge Region 45,478 48,691 7.1% Source: Alberta Finance and Enterprise, Statistics ... University of Lethbridge offers masters and doctoral programming, and we integrate graduate studies with ... Education, Fine Arts, Health Sciences, Management, Graduate Studies Executive Directors — Ancillary Services, ...

  3. School of Graduate Studies

    https://www.ulethbridge.ca/graduate-studies

    Welcome to the School of Graduate Studies Our office is currently open by appointment only Send ... appointment  requests to sgs@uleth.ca Monday to Friday, 8:30 a.m. to 4:30 p.m. School of Graduate Studies ... School of Graduate Studies, Mission Statement Our Stories Research symposium provides University of ...

  4. 2010-11 Fees and Rates

    https://www.ulethbridge.ca/vp-admin/2010-11-fees-and-rates

    Proposed 2011-12 % Inc Proposed 2012-13 % Inc Proposed 2013-14 Internal billing rate 43.45 6% 46.50 6% ... 39.30 6% 41.66 6% 44.16 6% 46.81 Utilities 6% 6% 6% 6% Trade 38.10 6% 40.39 6% 42.81 6% 45.38 6% 48.10 ... Faculty/staff Permit 45.00 0% 45.00 0% 45.00 0% 45.00 0% 45.00 Metered/Dispenser 1.00/hr 0% 1.00/hr 0% 1.00/hr ...

  5. 2012-13 Fees and Rates

    https://www.ulethbridge.ca/vp-admin/2012-13-fees-and-rates

    calculating the maximum fee increase in 2012-13 is 1.45% (2011-12:.35%, 2010-11: 1.5%, 2009-10: 4.1%). ... % Proposed % Proposed 2011-12 Inc 2012-13 Inc 2013-14 Inc 2014-15 Undergrad Canadian 485.5 1.45% 492.5 1.45 ... % Proposed 2011-12 Inc 2012-13 Inc 2013-14 Inc 2014-15 EAP Full-time Tuition 3,493 1.45% 3,544 1.45% 3,595 ...

  6. 2012-2013 Budget

    https://www.ulethbridge.ca/vp-admin/2012-2013-budget

    by AET, used for the 2012-13 increases is 1.45% (.35 % in 2011-12, 1.5% in 2010-11, 4.1% in 2009-10). ... indicates the base operating grant on a per student basis. 39,769,061 41,292,825 45,284,900 50,599,000 ... 1.45% 2.0% 1.45% 2.0% 1.45% Expenditures Compensation increases- merit- market- benefits Contracts ...

  7. Institute for Child and Youth Studies

    https://www.ulethbridge.ca/research/centres-institutes/institute-child-and-youth-studies

    the Board of Governors on October 11, 2012, and our first Annual General Meeting was held on April 19, ... Institute for Child and Youth Studies Who are We? Goals of I-CYS The University of Lethbridge’s ... Institute for Child & Youth Studies (I-CYS) is a multidisciplinary research institute committed to ...

  8. Comprehensive Institutional Plan 2013-2014 to 2015- 2016

    https://www.ulethbridge.ca/vp-admin/comprehensive-institutional-plan-2013-2014-2015-2016

    Reporting System, Enterprise and Advanced Education 2007 2010 2009 2012 Have used academic advising 45% 56% ... Science, Education, Fine Arts, Health Sciences, Management; School of Graduate Studies Administrative Units ... 8 2 0 0 8-0 9 2 0 0 9-1 0 2 0 1 0-1 1 2 0 1 1-1 2 2 0 1 2-1 3 2 0 1 3-1 4 2 0 1 4-1 5 2 0 1 5-1 6 0-2% range ...

  9. 2013-2014 Budget

    https://www.ulethbridge.ca/vp-admin/2013-2014-budget

    be used for the 2013-14 increases was to be 2.15% (1.45% in 2012-13, 0.35 % in 2011-12, 1.5% in ... $1.2 million. For 2012-13 through to 2014-15 EAE had stated that the University would receive a 2% ... by Faculty Actual Estimated Proposed Proposed Proposed 2011-12 2012-13 2013-14 2014-15 2015-16 hrs ...

  10. Annual Report to Alberta Advanced Education 2013-2014

    https://www.ulethbridge.ca/vp-admin/annual-report-alberta-advanced-education-2013-2014

    ,902 Cumulative investment gains- unrealized 2,586 3,780 6,366 Total Endowments 45,595 6,436 52,031 Accumulated ... 6,000 6,500 7,000 7,500 2009/10 2010/11 2011/12 2012/13 2013/14 Attendees Number of Events 11,030 11 ... Lethbridge 2013-2014 Annual Report 4 YEAR IN REVIEW UNIVERSITY OF LETHBRIDGE AT A GLANCE 2013-14 2012 ...